News & Gallery

Transient Operational HAZOPS for PT Pertamina (Persero) RU VI Balongan & RU V Balikpapan

April 2019 – July 2019 (Balongan) &  Jan 2019 – mid 2020 (Balikpapan), Process Hazard Analysis (PHA) is one of the …

Fire Protection Design Philosophy & Assessment for PT Pertamina (Persero) RU II Dumai, RU III Plaju, & RU V Balikpapan

Period April 2019–July 2019, Emergency preparedness relate

Asset Revaluation for PT Badak LNG, Oct 2018

15 -19 October 2018 ,Conduct Asset Revaluation for Insurance purposes to produce RAN (Reinstatement As New)……

 

Asset Revaluation for RU-III Plaju & Sungai Gerong

12 -16 November 2018 Conduct Asset Revaluation for Insurance purposes to produce RAN (Reinstatement As New)….

 

Asset Valuation for PT Benuo Taka Wailawi, December 2018

18-9 December 2018, Conduct Asset Valuation for Insurance purposes to produce RAN (Reinstatement As New) value as reference for Sum Insured. ……..

Major Accident Hazard (MAH) Report 2018

PT Pertamina (Persero) RU II Dumai, The major inherent process hazards associated with the refinery relate to the processing of light ends, particularly in ……

Emergency Protection & SCE Performance Standard 2018

PT Pertamina (Persero) RU III Plaju, Emergency respond related fire incident will be more effective and efficient if supported by adequate of emergency ,…

Operational Risk Survey PT Telkom Indonesia 2018

Evaluation and analysis of Express Maximum Loss (EML) Exposure,Maximum Foreseeable Loss(MFL),Normal…

 

Asset Valuation Camar Resources Canada Inc

Conduct Asset Valuation for Insurance purposes to produce RAN (Reinstatement As New) value as reference for Sum Insured. The valuation includes the offshore…

Marine Risk Management Program Survey for FB Wisnu XII

Carry out a Risk Management Program inspection in accordance with Hull and Machinery checklist…

Marine Risk Management Program Survey for MT Patra Tanker 2

Carry out a Risk Management Program inspection in accordance with Hull and Machinery …

Marine Risk Management Program Survey for MT Gebang

Carry out a Risk Management Program inspection in accordance with Hull and Machinery….

Have a Project in Mind?

Let’s Get Contact US!

Visit Us

Wisma Tugu II, 4th Floor
Jl. HR. Rasuna Said, Kav. C 7-9
Jakarta, 12920, Indonesia

Contact us

Tel : 62 (21) 520 8244
 Fax : 62 (21) 520 8243
synergy@synergy.co.id
www.synergy.co.id

Open Hours

M-F : 8.00am – 17.00pm